Home > Buy Now > Metal Processing Machinery > Other Metal Processing Machinery > Galvanized Metal Roof Sheets Cold Forming Machinery
 
5 1


Lingluo Tech
 
icon Products

line

icon Company Profile
icon Selling Leads
icon Index

line

 
Contact us
Lingluo Tech
[China]
Address:
NO.166 Renmin Road, Chengxiang Town ,Taicang City, Jiangsu Province. Suzhou Jiangsu China
Phone:
86-0512-53538211
Contact name:
Nancy




Lingluo Tech

 

Galvanized Metal Roof Sheets Cold Forming Machinery

Facebook   Twitter   Delicious   Google   My EC21   Email this page   Report Item Inquire now
Galvanized Metal Roof Sheets Cold Forming Machinery

Click to enlarge image

 Origin

China


alvanized Metal Roof Sheets Cold Forming Machinery parameters

1

Main motor power

5.5KW

2

Hydraulic motor power

5.5KW

3

Hydraulic pressure

10-12MPa according to the oil pump and pump motor

4

Voltage

380V/ 3 phase/ 50 Hz (or as your requirements)

5

Control system

Automatic PLC control system

6

Mainframe

350/400H beams according to machine demands

7

Wall sheet thickness

16-22mm according to machine demands

8

Chain size

1 /1.2inch according to machine demands

9

Feeding material

Galvanized steel coil, color steel coil, aluminum steel coil

10

Feeding thickness

0.3-0.8 mm

11

Productivity

0 – 25m/min

12

Roll station

Common 11rolls or 25rolls

13

Roller diameter

70mm, 75mm, 80mm (depends on different design)

14

Roller material

45# steel

15

Cutter material

Cr12MOV

16

Cr-plating size

0.05 mm

Galvanized Metal Roof Sheets Cold Forming Machinery production process

  • Drawing confirmation——After confirming the final drawing with the customer, the team of 12 engineers worked out the diagram;

    ——After 5 verifications, the production manager arranges the procurement of raw materials according to the drawings;

  • Start production——The company has 12 roughing machines, 20 finishing machines, and 30 cutting machines, starting to produce machine parts.
  • Product Inspection——Wheels and axis: Test 90% of the wheels and shafts, test their accuracy and performance after processing. All the wheels and shafts are hot-chromed. ensuring that two quality inspectors use a film tester to measure the thickness of the hot-dip chrome plating to ensure that each place reaches 5 microns or more.

    ——Mainframe and medium plate: Verify the accuracy of the mainframe and the middle plate after cutting.

  • Assembling machine parts——The assembly team consisted of 5 people and was assembled in one day.



  Delivery lead time

25-35 days after received the deposit

  Supply ability

25-35 days after received the deposit


Inquire now